2023 Jan
|
23-1 |
Influx during MPD Operations
|
2022 Nov
|
22-11 |
Higher than predicted pore pressure during completion operations lead to an influx after gravel pack operation
|
2022 Oct
|
22-10 |
Wellbore flow observed while setting emergency casing slips
|
2022 Sep
|
22-9 |
Lack of management of change process, associated with late detection, caused considerable kick volume on regular completion operations
|
2022 Aug
|
22-8 |
Kick while drilling underbalanced to a poorly isolated tight formation behind casing.
|
2022 Aug
|
22-7 |
Well flowed when BOP was removed to install the casing slips and pack off
|
2022 Jun
|
21-6 |
Drilling break observed while drilling 12 Ľ” hole section. Increased flow observed after the drilling break.
|
2022 May
|
22-5 |
Hydrocarbon flow during gauge change-out
|
2022 Apr
|
22-4 |
Well Control Incident with Complications While Attempting to Cure Total Losses
|
2022 Mar
|
22-3 |
Uncontrolled flow during coiled tubing nitrogen lifting operation
|