2021 Jun
|
21-6 |
Significant Influx taken during Managed Pressure Drilling (MPD) Operations
|
2021 Mar
|
21-4 |
Gas Release During Abandonment Operations
|
2021 Feb
|
21-3 |
Wrong practices for influx detection while manipulating fluids at the surface
|
2021 Feb
|
21-2 |
Intermittent gas release observed around tool catcher/grease injection head during E-line operations. Gas release was noted as a near miss well control event.
|
2021 Jan
|
21-1 |
BOP Test Assembly Ejected from Well
|
2020 Oct
|
20-8 |
Lubricate and bleed influx behind cemented casing
|
2020 Oct
|
20-7 |
Unexpected failure of the Rotating Control Device bearing rubber during a Managed Pressure Drilling operation caused a loss of well control event
|
2020 Jun
|
20-5 |
Kick taken while drilling in the production hole section resulting in well control incident.
|
2020 May
|
20-4 |
Influx following failure of reservoir isolation device
|
2020 Jan
|
20-3 |
Gas breakout from mud returns migrates to ignition source
|