The International Association of Oil & Gas Producers (IOGP) Well Control Incident lesson sharing system was established as a means of notifying fellow IOGP members and the wider community of the lessons learned from well control incidents and near misses. The sharing of these lessons will help to promote learning and avoid the repetition of similar errors. The result will move the industry to a higher level of well control safety. IOGP is grateful for all contributions and the continued support of the Well Control Incident Database reporting system.
Subscribe here to receive latest Lessons Shared by email
Issued
No.
Title
2023 May
23-5
Surface gas release after cutting production casing string
2023 Mar
23-4
Abnormal formation pressure encountered while drilling due to offset water injection wells
23-3
Influx observed while drilling out lower cement plug on well being abandoned
2023 Feb
23-2
A treatment directly performed in the active pit caused an unexpected mud density reduction in the well followed by a formation influx
2023 Jan
23-1
Influx during MPD Operations
2022 Nov
22-11
Higher than predicted pore pressure during completion operations lead to an influx after gravel pack operation
2022 Oct
22-10
Wellbore flow observed while setting emergency casing slips
2022 Sep
22-9
Lack of management of change process, associated with late detection, caused considerable kick volume on regular completion operations
2022 Aug
22-8
Kick while drilling underbalanced to a poorly isolated tight formation behind casing.
22-7
Well flowed when BOP was removed to install the casing slips and pack off
<< < First page < previous page next page >