<<< Back to Results
|
||
Flow observed from the annulus 2 hours after the completion of a 13 3/8” casing cementing operation. The flow noted has been deemed a controlled well control event. |
||
After completing a 13 3/8” casing cementing operation, and while waiting on weather (WOW) to lay down the cement head post cement job with the casing hanger running tool still connected, flow from the annulus side was observed. The flow started 45 minutes after the cement was in place. The initial flow observed was approximately 2.1 bbl/hr to the trip tank. After 2 hours, and observing flow in excess of predicted thermal expansion values, the well was shut in on the upper annular BOP with pressures being monitored.
IOGP Wells Expert Committee/Well Control Incident Subcommittee believes that this incident description contains sufficient lessons to be shared with the industry. We further encourage the recipients of this mail to share it further within their organization. After completing cementing operations on the 13" 3/8 casing and while WOW to lay down the cement head post cement job with the casing hanger running tool still connected, flow from the annulus side was observed starting 45 minutes after cement in place with an overall increase in trip tank of 2.1bbl/hr. After 2 hours, and observing flow in excess of predicted thermal expansion values, the well was shut in on the upper annular BOP. Pressure was 1140 psi on the Drillpipe running string and 1240 psi on Casing. Over the course of 2 days a series of controlled diagnostic bleeds were carried out on both the casing and annular side. It was concluded that the observed flow and pressure build-up on the annulus side was not due to thermal expansion, but that an influx of formation fluid had most likely entered the wellbore and we had an annulus flow channel from formation to surface. Attempts were made to bullhead the suspected influx back to the formation. However, injection pressure was limited by the presence of a burst disk in the 22” surface casing. Following a risk assessment, and recognizing that the rate of influx had stabilized at a low rate, it was agreed to open the BOP, release the running tool and recover the casing landing string, and then run in with the casing seal assembly on the Drillstring and secure the 13 5/8" x 22" annulus by setting this seal assembly in the wellhead. This operation was a success and the incident closed. | ||
What Went Wrong?:
| ||
Corrective Actions and Recommendations:
| ||
|
||
safety alert number: 329
|
||
Disclaimer
Whilst every effort has been made to ensure the accuracy of the information contained in this publication, neither the IOGP nor any of its members past present or future warrants its accuracy or will, regardless of its or their negligence, assume liability for any foreseeable or unforeseeable use made thereof, which liability is hereby excluded. Consequently, such use is at the recipient's own risk on the basis that any use by the recipient constitutes agreement to the terms of this disclaimer. The recipient is obliged to inform any subsequent recipient of such terms. |
||