2023 Nov
|
23-11 |
Severe losses in carbonate reservoir – unable to maintain primary well barrier
|
2023 Oct
|
23-10 |
Well control incident due to pore pressure uncertainties
|
2023 Sep
|
23-9 |
An influx circulated up into the riser despite a flow check observed stable
|
2023 Sep
|
23-8 |
Leaking flange between coil tubing BOP and stripper assembly
|
2023 Jul
|
23-7 |
MPD Software Input Results in WCI
|
2023 Jun
|
23-6 |
Wellbore flow observed during fishing of completion tubing string
|
2023 May
|
23-5 |
Surface gas release after cutting production casing string
|
2023 Mar
|
23-4 |
Abnormal formation pressure encountered while drilling due to offset water injection wells
|
2023 Mar
|
23-3 |
Influx observed while drilling out lower cement plug on well being abandoned
|
2023 Feb
|
23-2 |
A treatment directly performed in the active pit caused an unexpected mud density reduction in the well followed by a formation influx
|