2018 Aug
|
18-4 |
Confirm that all equipment in the well control circulating path is rated for the application
|
2018 May
|
18-3 |
Delayed Well Control Shut-in during auto-choke Managed Pressure Drilling
|
2018 Feb
|
18-2 |
Loss of well control, hole and drill string due to poor communication and well monitoring.
|
2018 Mar
|
18-1 |
Misunderstood pore pressure, lack of vigilance and empowerment cause Well Control Incident.
|
2017 Oct
|
17-9 |
Well Control Event while using Managed Pressure Drilling equipment
|
2017 Sep
|
17-8 |
Migration Below Completion Barrier Unloads Riser During Subsequent Circulation
|
2017 Oct
|
17-7 |
Several contributing factors add up to a NAF discharge overboard
|
2017 Jul
|
17-6 |
Shallow Water Flow in Land Well
|
2017 Jul
|
17-5 |
Break of formation in a narrow mud weight window drilling. Well controlled using the modified wait and weight method
|
2016 Dec
|
16-5 |
Misinterpreted swabbed kick from shallow reservoir leads to delicate well control situation
|