Intermittent gas release observed around tool catcher/grease injection head during E-line operations. Gas release was noted as a near miss well control event.


During a Rigless intervention, while running an E-line BHA on an oil producer well, an intermittent gas leak was observed around the tool catcher/grease injection head. There was an attempt to increase pressure in the inflow tubes with no success. It was decided by field personnel to POOH with the E-line BHA - at high speed - until BHA was secured at the surface inside the Pressure Control Equipment (PCE). Both PCE and a wireline BOP stack were rigged up on the surface. The BOP was not activated during the mitigation of the gas release. The Swab and Upper Master valve were both closed and the PCE bled off. Both valves were closed within 15 minutes after the initial gas release.

What Went Wrong?:

  • The leaking tool catcher was inspected during a formal investigation by tool catcher provider where it was revealed that the main O-ring had failed. In addition, it was later identified that the O-ring was from a batch that was deemed to be non-conforming for the designed application.
  • It was also noted that there were inexperienced wireline personnel on location. This was noted by their reluctance to shut-in the well with the wireline BOP. In addition, having difficulties to appreciate the potential severity of the gas leak which took place at night where it was also noisy.
  • The wellsite intervention program did not provide for a clear decision tree for when to POOH safely during an emergency situation.

Corrective Actions and Recommendations:

  • Provide better training for the field operations staff. Office operations staff must also have more training in the area of fit-for-purpose operations programs. Specifically, programs to provide clear guidance or decision trees for actions to take in the event of an emergency during wireline operations.
  • Ensure that a QAQC program is in place to ensure parts for the tool catcher, and other related equipment, are up to specifications for the planned operations.
  • Tool catcher vendor to provide a spare parts package that will include two different O-ring batches for each part of their equipment.
  • Reiterate with supervisors and contractors to secure the well as per their well control training. The first priority of well control - in case of loss of containment during well intervention - is to shut-in the well using primary well control methods, such as shutting in on the wireline BOP.


safety alert number: 321
IOGP Well Control Incident Lesson Sharing http://safetyzone.iogp.org/

Disclaimer

Whilst every effort has been made to ensure the accuracy of the information contained in this publication, neither the IOGP nor any of its members past present or future warrants its accuracy or will, regardless of its or their negligence, assume liability for any foreseeable or unforeseeable use made thereof, which liability is hereby excluded. Consequently, such use is at the recipient's own risk on the basis that any use by the recipient constitutes agreement to the terms of this disclaimer. The recipient is obliged to inform any subsequent recipient of such terms.
This document may provide guidance supplemental to the requirements of local legislation. Nothing herein, however, is intended to replace, amend, supersede or otherwise depart from such requirements. In the event of any conflict or contradiction between the provisions of this document and local legislation, applicable laws shall prevail.