During a Rigless intervention, while running an E-line BHA on an oil producer well, an intermittent gas leak was observed around the tool catcher/grease injection head. There was an attempt to increase pressure in the inflow tubes with no success. It was
decided by field personnel to POOH with the E-line BHA - at high speed - until BHA was secured at the surface inside the Pressure Control Equipment (PCE). Both PCE and a wireline BOP stack were rigged up on the surface. The BOP was not activated during the
mitigation of the gas release. The Swab and Upper Master valve were both closed and the PCE bled off. Both valves were closed within 15 minutes after the initial gas release.
|
Disclaimer
Whilst every effort has been made to ensure the accuracy of the information contained in this publication, neither the IOGP nor any of its members past present or future warrants its accuracy or will, regardless of its or their negligence, assume liability for any foreseeable or unforeseeable use made thereof, which liability is hereby excluded. Consequently, such use is at the recipient's own risk on the basis that any use by the recipient constitutes agreement to the terms of this disclaimer. The recipient is obliged to inform any subsequent recipient of such terms.
This document may provide guidance supplemental to the requirements of local legislation. Nothing herein, however, is intended to replace, amend, supersede or otherwise depart from such requirements. In the event of any conflict or contradiction between the provisions of this document and local legislation, applicable laws shall prevail.
|