Wrong practices for influx detection while manipulating fluids at the surface


While drilling the 8 ½" section, an 8m3 drilling fluid transfer to the active pit was carried out from the reserve pit which was not equipped with sensors. At this point, a sudden increase of SPP and mud flow-out percentage were detected, and bubbling was observed from the rig floor. The well was shut in, showing the following data: SICP stabilized at 2700 psi, SIDPP at 75 psi (float valve present in the BHA) and an approximated gain of 15 m3.

The well was controlled implementing the driller's method with a final MW of 2.24 (after four cycles of mud increments).

What Went Wrong?:

  • The pit volume was masked by the ongoing drilling fluid transferring operation at the surface. The total gas influx was estimated between 10-20 m3
  • The pore pressure estimated for well design (1.78 sg) was significantly lower than the pore pressure encountered (estimated at 2.18 sg)
  • People's awareness of the associated risks proved to be low; gas had been circulated while drilling, but it was not associated with the fluids' transfer risk
  • Detection systems did not work as intended: The theoretical threshold for detection was 5 bbls, but the system allowed an influx >10m3

Corrective Actions and Recommendations:

  • Implement a program to increase awareness of well integrity operations and associated risks
  • Review and enhance influx detection system
  • Define clear instructions for fluid transferring at the surface to avoid losing control of the active system
  • Implement detection drills for well influx to reduce closing time. Reinforce procedural adherence both for the supervisory staff and the crew


safety alert number: 322
IOGP Well Control Incident Lesson Sharing http://safetyzone.iogp.org/

Disclaimer

Whilst every effort has been made to ensure the accuracy of the information contained in this publication, neither the IOGP nor any of its members past present or future warrants its accuracy or will, regardless of its or their negligence, assume liability for any foreseeable or unforeseeable use made thereof, which liability is hereby excluded. Consequently, such use is at the recipient's own risk on the basis that any use by the recipient constitutes agreement to the terms of this disclaimer. The recipient is obliged to inform any subsequent recipient of such terms.
This document may provide guidance supplemental to the requirements of local legislation. Nothing herein, however, is intended to replace, amend, supersede or otherwise depart from such requirements. In the event of any conflict or contradiction between the provisions of this document and local legislation, applicable laws shall prevail.


IOGP