Influx following failure of reservoir isolation device


On a subsea well the lower completion, including a pressure-actuated reservoir or formation isolation device (RID / FIV), had been installed. The upper completion was also run, the tubing hanger successfully landed and tested, and the well was being reverse circulated, down the annulus and up the tubing, to underbalanced packer fluid prior to setting the production packer.

During the displacement an increase in gas trends was observed in the fluid returns. Monitoring of the well was switched to the trip tank and increasing volume was observed - the well was flowing. Displacement to packer fluid was stopped and the well was bullheaded confirming that the reservoir isolation device had failed. The reservoir isolation device had been previously tested to 4,000psi and was planned to only be opened once the upper completion had been run and the production packer set.

Overbalanced brine was bullheaded down the tubing, the upper completion production packer was then set and the well controlled.

What Went Wrong?:

The root cause is believed to be the failure of the reservoir isolation device either due to a manufacturing or materials defect or due to the pre-job preparation of the valve’s pressure cycle count.

Other possible failure options that were considered but have been ruled out following investigation include:

  • Lower completion packer leak.
  • Accidental pressure cycling of ‘half-cocked’ reservoir isolation device causing valve to jump cycles.
  • Accidental cycling of the valve during transportation or gravel pack operations.
  • Nitrogen quality, pre-charge pressure or leak.
  • Inadvertent mechanical shifting of valve.

Corrective Actions and Recommendations:

The well’s primary barrier element failed, and it was only the crew’s attentiveness and subsequent courage to take action that prevented this well control incident becoming much worse.

The following recommendations specific to reservoir isolation devices have been adopted:

  • Increase QA/QC level during onshore preparation of reservoir isolation devices.
  • Ensure full understanding of how pressuring cycling on reservoir isolation valves can cause the valve to inadvertently jump cycles.
  • Perform a low-pressure test of reservoir isolation device after last known high-pressure test to ensure the valve is not prematurely cycled open prior to installation of completion.


safety alert number: 315
IOGP Well Control Incident Lesson Sharing http://safetyzone.iogp.org/

Disclaimer

Whilst every effort has been made to ensure the accuracy of the information contained in this publication, neither the IOGP nor any of its members past present or future warrants its accuracy or will, regardless of its or their negligence, assume liability for any foreseeable or unforeseeable use made thereof, which liability is hereby excluded. Consequently, such use is at the recipient's own risk on the basis that any use by the recipient constitutes agreement to the terms of this disclaimer. The recipient is obliged to inform any subsequent recipient of such terms.
This document may provide guidance supplemental to the requirements of local legislation. Nothing herein, however, is intended to replace, amend, supersede or otherwise depart from such requirements. In the event of any conflict or contradiction between the provisions of this document and local legislation, applicable laws shall prevail.


IOGP