Corrective Actions and Recommendations:
- Several pressure points where taken in the reservoir and these were used to reduce to mud weight from 1,08 sg to 1,05 sg brine. This reduction turned out to result in too great a weight decrease, since there were two small sand zones exposed that where
not picked up on the log. It is important not to place to great a reliance on pressure points taken during the section, since there can be small zones that have not been caught on the log that may have a different pressure.
- Instead of displacing the well to kill mud during the second circulation of the drillers method, the team decided to displace to a higher weight brine. This meant that they would continue operations faster, after the kill, than would have been the case
if they displaced to drilling mud.
|
Disclaimer
Whilst every effort has been made to ensure the accuracy of the information contained in this publication, neither the IOGP nor any of its members past present or future warrants its accuracy or will, regardless of its or their negligence, assume liability for any foreseeable or unforeseeable use made thereof, which liability is hereby excluded. Consequently, such use is at the recipient's own risk on the basis that any use by the recipient constitutes agreement to the terms of this disclaimer. The recipient is obliged to inform any subsequent recipient of such terms.
This document may provide guidance supplemental to the requirements of local legislation. Nothing herein, however, is intended to replace, amend, supersede or otherwise depart from such requirements. In the event of any conflict or contradiction between the provisions of this document and local legislation, applicable laws shall prevail.
|