2023 Jun
|
23-6 |
Wellbore flow observed during fishing of completion tubing string
|
2023 May
|
23-5 |
Surface gas release after cutting production casing string
|
2023 Mar
|
23-4 |
Abnormal formation pressure encountered while drilling due to offset water injection wells
|
2023 Mar
|
23-3 |
Influx observed while drilling out lower cement plug on well being abandoned
|
2023 Feb
|
23-2 |
A treatment directly performed in the active pit caused an unexpected mud density reduction in the well followed by a formation influx
|
2023 Jan
|
23-1 |
Influx during MPD Operations
|
2022 Nov
|
22-11 |
Higher than predicted pore pressure during completion operations lead to an influx after gravel pack operation
|
2022 Oct
|
22-10 |
Wellbore flow observed while setting emergency casing slips
|
2022 Sep
|
22-9 |
Lack of management of change process, associated with late detection, caused considerable kick volume on regular completion operations
|
2022 Aug
|
22-8 |
Kick while drilling underbalanced to a poorly isolated tight formation behind casing.
|